1932.2A Averill Park CSD: Capital Project Phase 2A - #98943

Averill Park CSD: Capital Project Phase 2A - Work includes restoration of existing metal canopies at the High School
01 Drawings (click to expand/collapse)
Name Size
001 Cover 951.6 KB
002 GH001 587.3 KB
003 GHDR1 172.8 KB
004 GHDR2 179.4 KB
005 GHDR3 153.8 KB
006 GHDR4 222.3 KB
007 GH101 177.3 KB
008 GH102 168.3 KB
009 GH103 150.2 KB
010 GH301 165.3 KB
011 GH302 163.3 KB
012 GH303 147.5 KB
013 GH304 182.4 KB